NASA FLIGHT CONTROL DIRECTIVE

ROTATE DEVICE TO LANDSCAPE

Deep-space orbital telemetry and flight controls require widescreen landscape orientation.

SUBSYS 01: POWER ARRAYS ➔
SUBSYS 02: HIGH-GAIN COMMS ➔
SUBSYS 03: DEFLECTOR SHIELD ➔
PROJECT AURORA
INITIALIZING... 0%
NASA SPACE APPS • PROJECT AURORA

PROJECT AURORA

EARTH NEEDS YOU. CAN YOU DESIGN A MISSION THAT MAKES IT HOME?
MISSION ARCHITECTURE • CELESTIAL DOSSIER SPECIFICATION
CELESTIAL DOSSIER • TARGET: MARS CLASS IV • DEEP ASTROBIOLOGY

AURORA PRIME • MARS HABITABILITY MISSION

MISSION OBJECTIVE NARRATIVE

Search for signs of past microbial life and map subsurface water ice reserves.

FLIGHT ARCHITECTURE SPECIFICATIONS
MISSION DIFFICULTY [ADVANCED]
ROUND-TRIP DURATION [18 MONTHS ROUND-TRIP]
CREW COMPLEMENT [4 ASTRONAUTS]
TRAJECTORY WINDOW [HOHMANN TRANSFER ORBIT]
PRIMARY SURFACE TARGET & COORDINATES [JEZERO CRATER DELTA • 18.38°N 77.58°E]
SURFACE GRAVITY 0.38g (3.72 m/s²)
SURFACE PRESSURE 6.1 mbar (0.006 atm)
RADIATION INDEX HIGH • SPE RISK
NASA OPEN DATA API • REAL-TIME TELEMETRY INITIALIZING...
ACTIVE MISSION NASA Mars 2020 Perseverance
SOL / ORBIT CYCLE Sol 1320
AUTHENTIC DATASET PROVENANCE NASA PDS: M2020-PIXL-2-EDR-V1.0 / CRISM-TRDR-V3
SURFACE ENVIRONMENT -62°C · 590 W/m²
SPACE WEATHER / RAD 0.67 mSv/day (NOMINAL)
PROJECT AURORA
STAGE 01 • EARTH DEPARTURE ARES V • HOHMANN TRANSFER TO MARS
WARP ACCELERATION: 11.2 KM/S
TRANSIT STAGE: DEEP SPACE CRUISE
DISTANCE TO MARS: 54,600,000 KM
FUEL: 98%
POWER NET: +17.0 kW
CRITICAL TACTICAL ALERT • SOLAR PARTICLE EVENT (SPE)

⚠️ CLASS X-12 CORONAL MASS EJECTION DETECTED

Extreme solar proton flux (850 mSv/hr) detected along current trajectory vector. Relativistic shock front impact in seconds. Select radiation mitigation protocol:

15
SECONDS TO SHOCK IMPACT • CRITICAL TACTICAL RESPONSE REQUIRED
NASA MISSION CONTROL • EXPEDITION DEBRIEF

MISSION RESULTS • TRANSIT SURVIVED

MISSION SUCCESSFUL
INTERPLANETARY FLIGHT EVALUATION • FLIGHT DIRECTOR
MISSION SCORE: 87 / 100
★ ★ ★ ★ ★ TIER: FLIGHT COMMANDER • EXEMPLARY
• SUBSYSTEM PERFORMANCE & MISSION EFFICIENCY
🛡️ MISSION SAFETY 92%
🔬 SCIENCE VALUE 87%
⚡ RESOURCE MANAGEMENT 81%
⚙️ EFFICIENCY 89%
TRANSIT DURATION 214 DAYS
DISTANCE TRAVELED 225.5M KM
CREW STATUS 100% NOMINAL
STORM MITIGATION DEFLECTED
NASA MISSION CONTROL • EDUCATIONAL FLIGHT DEBRIEF

POST-TRANSIT ANALYSIS • 3D SCIENTIFIC DOSSIER

3D CYLINDRICAL CAROUSEL • DRAG, WHEEL OR ARROWS TO CYCLE • CLICK TO EXPAND DOSSIER
NASA TECHNICAL FLIGHT REPORT • PHASE 03

WHAT HAPPENED? • MISSION EVENT ANALYSIS

🔬 1. SCIENTIFIC ANALYSIS NARRATIVE & TELEMETRY LOG

Midway along the 214-day Hohmann transfer to Mars at Month 9, orbital radiation sensors detected a Class X-12 Coronal Mass Ejection (CME) shock front traveling at ~1,850 km/s. Astronauts had 15 seconds to execute radiation mitigation procedures.

The Flight Director activated the superconducting magnetic deflector shield. Drawing 24 kW of auxiliary battery power, the artificial magnetosphere bent incoming 850 mSv/hr proton flux safely away via the Lorentz force F = q(v × B), keeping interior crew cabin exposure at nominal levels (<0.05 mSv).

KEY OUTCOME: Zero acute radiation dosage absorbed, critical semiconductor avionics preserved, and 1.4 km/s Mars polar orbital capture burn executed on schedule.
📈 2. SOLAR STORM IMPACT GRAPH (mSv/hr vs TIME)
850 500 250 50 0 T=0s T=15s (Shock) T=30s (Shielded) T=60s NASA SAFETY THRESHOLD (<50 mSv) PEAK: 850 mSv/hr DEFLECTED: 0.04 mSv/hr
UNSHIELDED SPACE FLUX
ACTIVE CABIN DOSAGE
🔀 3. BRANCHING DECISION TREE & MISSION IMPACT
⚠️ CLASS X-12 CME SHOCK DETECTED • 15 SECONDS TO IMPACT
OPTION A: ACTIVE SHIELD SUPERCONDUCTING DEFLECTOR 24 kW Aux Power Draw • 100% Protection • Telemetry Online
OPTION B: PASSIVE BUFFER WATER WALL STORM SHELTER Zero Power Draw • 85% Absorption • 15m Telemetry Loss
MISSION OUTCOME
✓ HOHMANN CRUISE PRESERVED ➔ 320 KM MARS POLAR ORBIT CONFIRMED
🚀